🚥 Gasworks Maintenance Pages

Task Boards

Gasworks General Information

Room specific QR Code Information
Site plans, maps and drawings
Supplier Book
Supplier ofNameWebsiteTownWA
Electrical equipmentTEDhttps://www.townelectrical.comUttoxeter
Water SafetyAbsolute WaterCraig Taylor
Rachel Symons
absolute-water.co.ukNational
Fire Control systemAPS Security & FireTom Warrilowapssecurity.co.ukNottingham
Fire Extinguisherhttps://www.midland-fire.co.uk/
Weed controlBorder PatrolTom Evanshttps://www.border-patrol.co.uk/Link
FencingWoolley FencingSam Woolley07791 423974SudburyLink
Window CleaningDaleDale+44 7930 698192Link

Insurances & Licenses
  • Health & Safety at Work Act
  • Premise License
  • Insurance
Bin collection Derbyshire Dales / Peak Waste (01335 – 342276)

Peak Waste 1100 Litre Bin – all types of waste can be thrown in this bin including mixed recycle and food waste. Under the simpler recycle legislation. This will change in 2027

Derbyshire Dales Garden Waste – Not in Use

Derbyshire Dales – General – Not in Use

Derbyshire Dales – Recycle – Not in Use

Simpler Recycling Legislation 2025

History Group Sharepoint Drive

Document archive on Sharepoint

Compliance & important maintenance checks. Excel (old)

Event-driven / adhoc Checks

Sound Level Monitoring – Event specific 🔴 Updated 11/11/23 – Next due at next licensed event

– Check sound readings at predetermined points around the premises.

  • Retort Yard – Post box;
  • School Lane – GW Notice board
  • Severn Trent Gate
  • Bug Hotel
Toilet Monitoring – Event specific 🔴Updated 20/8/25 – Next due at next licensed event

Toilet record sheet

Woodlands Inspection following High winds 🟢 Updated 05/11/2025
Risk Assessments
Near Miss & ACCIDENT BOOK – Last log entry 08/10/2025
Please record both near misses and accidents. Certain accidents must be reported under the RIDDOR regulations. For more information please check the reportable injuries link.

Weekly Checks

Water Safety – Flushing Log – Weekly 🟢 Updated 12/12/2025
Fire door inspections – Weekly 🟢 Updated 12/12/2025

Check to ensure door is operating correctly; locks in good working order; emergency lighting clear, working and present.

Electricity readings – Weekly 🟢 Updated 19/11/2025

Electricity meter reading sheet

Emergency lighting checks – Weekly 🟢 Updated 12/12/2025
Fire Extinguisher Checks – Weekly 🟢 Updated 12/12/2025

Fire extinguisher check records sheet

Check seals; not discharged; types and correctly positioned on stand.

Fire Call Point Checks – Weekly 🟢 Updated 12/12/2025

Check push button activates alarm; cancel; reset. Wednesday regular test.

Monthly Checks

Water Safety – Sentinel Temperature Checks – Monthly 🟢 Updated 11/10/2025
Gutters, Gullies and Culverts – Monthly 🟢 Updated 05/11/2025
Disabled Alarm – Monthly 🟢 Updated 12/12/2025

Quarterly Checks

First Aid Kit -Quarterly 🟢 Updated 11/2025 – Next due Nov 2025
  • 30/7/25 More plasters needed. Sun cream factor 30 added to kit.
Water Safety – Descaling – Quarterly Never done 🟡 – On hold by Trustee’s
Water Safety – Expansion Vessel Flush – Quarterly Never done 🔴 – On hold by Trustee’s

Expansion vessel record sheet

6 Monthly Checks

Weed killer – paved and gravel areas – 6 Monthly 🟡 16/10/2025

Border Patrol – Tom Evans contracted to do twice yearly. It does not seem to have worked properlu so Tome will repeat the treatment in the next few weeks, free of charge. Nic 02/10/2025

16/10/2025 – Hi Caroline, all completed at a higher dosage rate. This is not a dosage rate that is recommended as it’s a lot higher in an attempt to kill off all remaining vegetation.

This should do the job with no blue dye anywhere.

There was signs of previously it working but not as effectively as required. There are leaves around that have yellowed and wilted slightly but like I say, this if FOC and should rectify the lack of crispy weeds.

Kind regards
Tom

Annual Checks

Water Safety – Borescope inspection calorifier / Heaters / storage vessels – Never done 🔴 Scheduled – On hold by Trustee’s

Water Safety – Calorifier purge to drain – Annually

Portable Appliance Testing – Annual 🟡 Updated 14/11/2025

PAT Register

Fire Extinguisher Service – Annual 🟡 Last update 07/2024 – Next due 07/2025
  • Supplier: Midland-fire.co.uk
  • Booked in for 15/08/2025 – 10 am – chased copy of the certificate 22/10/25
Security Alarm – Annual 🔴 Updated 28/04/2023 – need to understand the frequency of test requirements.
Key audit ⚪ Updated DD/MM/YY

Key register 2024 (current)

Key register (old)

Fire Control System 🟢 21/10/2025

Supplier: APS

Annual contract

Supplier REX – installer / electrical contractor

Certificate 2023

Info graphic

Fire exit floor plan

Fire risk assessment

Water Safety – Thermostatic Mixing Valves – Annually Never done 🔴 Scheduled – On hold by Trustee’s

Thermostatic Mixing Valves Service record sheet

Benches Check

Benches service log

Bi-Annual Checks

Tree Safety Management

Tree Safety Policy

John Booth Report July 2017

John Booth Letter Sep 2022

Common Sense to Risk Management of Trees

Water Safety – Legionella Controls 🟢 Remedial work scheduled 21/10/25

Annual maintenance quote received – may wish to shop around? Awaiting remedial works quote to supply and modify toilet taps. 30/7/2025 NJC

Implement a Legionella Policy & Site Specific Written Scheme â€“ This can either be done by yourself / team or we offer this as a consultancy project; this covers the majority of management actions identified in the report.
Undertake Legionella Management Training for all staff involved in the management of legionella or undertaking tasks â€“ we offer either onsite legionella management courses or eLearning that can be completed at your leisure.
Implement a Suitable Legionella Control Logbook â€“ included with any monitoring programme.
Implement a Suitable Monitoring Programme â€“ a monitoring programme should be put together in line with HSG274 (part 1 to 3) where required and as per your written scheme of control.
Carry Out Remedial Actions â€“ remedial actions are detailed in the legionella risk assessment.
 
 
Kind regards
Rachel Symons
Scheduler
Absolute Water
Mobile: 07570120397
Email: planning@absolute-water.co.uk
My working hours are Monday – Friday 9:00 – 15:00

Contractor teams call scheduled 25/7/25 with Craig Taylor, Absolute Water
  • Two quotes requested.
  • Annual maintenance for items outside of NC skillset – received £400 pa
  • TMV installation at POU for toilet taps and TMV removal at calorifier – awaiting

Scheme of control

Water Safety Log excel

Schematic

5 Yearly Checks

Lightning Protection System – 5 Yearly – 🟢 Due May 2028

Due May 2028

Fixed Wiring Test – 5 Yearly – 🟢 Due May 2028

Due May 2028

Incidents / Disputes / Known defects / Projects

Incident Log
Emergency lighting repair and modifications
  • 19/11/25 Contacted ST again ref moving the two most vulnerable lights. Agreed to get quotes. Contractor visiting site 28/11/25. 3 other electricians failed to show.
  • B/Root installation required Several ground plates have been purchased. These provide a stable fixing in soft ground. Several of our lights ate very loose. It was considered that we may be able to get dove as part of the container project.
  • Bollard 035
  • At risk from tanker traffic. Consider if it can be moved in by 30mm to be protected by birdsmouth fencing. Modification to the driveway at the entrance to the ST plant has now been approved following a successful claim for £5k.
  • Bollard 041
  • Hit 3 x / base plate changed twice and complete bollard the first time.
  • Bollard 042
  • Replaced Aug 2024
Severn Trent dispute – tanker damage – new claim in progress 22/10/20

Full report here

Proposed Severn Trent Invoice 2 July 2025.docx

Two new area of damage noticed – proposed to get quotes to move lights out of the zone. 22/10/25

Severn Trent

Car Park Delineation

18 spaces have been defined using paving bricks dug into the ground. These allow for wide door opening. Two of the spaces are yet to be completed and then all markers need to be painted white.

Retort yard gate broken

The double gate has dropped and does not close easily

Remedial action legionella risk assessment

The water system installed is not designed to be compliant with water safety regulations and has the following top-level defects:

  • Toilet tap temperatures are too low due to a TMV installed at the calorifier
  • Cold feeds have been capped in T2/T3/T4 creating dead-legs
  • The sensor tap in T2 is defective and requires replacement. T2 has been locked and put ‘Out-of use’ until further notice
  • EVs have no flushing point

Proposal – Remove the TMV at the calorifier & install new mixer taps in each toilet. Increase the water temperature to >50 degrees celsius.

Remedial works quote 2 including taps Revised quote

Project – Retort House Floor

Project – Parapet cloaking – Aug 24

A 1 year trial of a canvass cloak over the parapet was initiated in August 2024. This was to test if the soaking of the brickwork by heavy rains, was solved by addition protection. In the last discussion with James, it was unclear if porous brickwork or pointing failure is the root cause. Open decision.

Project – Site containers / pathway and solar panels

Audio visual upgrade

Projector and screen upgrade needed if conferences are to be supported by minimum expected standards. Projector has a fault and the one donated by Steve does not have the required connection to WiFi / BT / Display HDMI port

Project – Secure Alcohol storage Oct 2025

Metal cabinet installed in plant room for storing of excess alcoholic stock.

Multimedia update

Projector and screen upgrade needed if conferences are to be supported by minimum expected standards. Projector has a fault and the one donated by Steve does not have the required connection to WiFi / BT / Display HDMI port

Project – Improve turning access to ST Plant – completed

Meadow

Meadow management
RHS advice on meadow Management

wild flower meadows, rhs how to look after one

The Royal Horticultural Society (RHS) advises that caring for a wildflower meadow depends on whether it is an annual or perennial type. The most crucial aspects of maintenance are the timing of cuts and keeping the soil’s fertility low to favor wildflowers over vigorous grasses. 

Care for a perennial wildflower meadow

Perennial meadows are long-term features that regrow each year. They often consist of a mix of perennial and some annual species. 

First year of establishment

To encourage strong root growth in a newly sown meadow, it is vital to mow regularly in the first year. 

  • Cutting: Mow to a height of 5cm (2in) six to eight weeks after germination and every two months during the first summer.
  • Weeding: Regularly remove vigorous weeds, such as docks, thistles, and nettles, which could otherwise overpower the delicate wildflowers.
  • No fertilizer: Do not add any fertiliser, as wildflowers thrive in low-nutrient soil. Excess nutrients will only promote grass growth. 

After the first year

Once established, a perennial meadow requires less frequent cutting. The timing of cuts can be adjusted to favor different species. 

  • Spring cut: Mow to about 7.5cm (3in) no later than the end of April. This is useful for lush, grass-dominant meadows.
  • Main summer cut (Hay cut): This removes the bulk of the vegetation and should be done between late June and the end of August, after the flowers have set seed.
    • Favoring spring flowers: Cut in late June.
    • Favoring summer flowers: Cut in August.
    • Remove cuttings: Leave the cut material for a few days to let the seeds drop, then rake it all up and remove it to reduce soil fertility.
  • Autumn cut: On fertile ground, a cut between late August and November removes surplus growth to keep grasses in check.
  • Introduce Yellow Rattle: If grasses are too dominant, sow Yellow Rattle (Rhinanthus minor) in August. This is a semi-parasitic annual that weakens grass growth. 

Care for an annual wildflower meadow

Annual meadows are seasonal features that flower in summer and then die off. 

  • First year: After flowering in late summer or autumn, allow the plants to scatter their seeds. Then, remove the faded plants by pulling them up or cutting them down.
  • Subsequent years: New plants will grow from the seeds scattered in the previous autumn. For a denser display, it’s a good practice to resow seeds for the first couple of years.
  • Weeding: Remove unwanted weeds manually throughout the season. 

How to manage cuttings

  • Avoid standard mowers: Regular lawnmowers may struggle with long grass. For smaller areas, use a strimmer or a scythe. For larger areas, a heavy-duty mower is best.
  • Protect wildlife: Before any major cut, walk through the meadow making noise to give small animals like hedgehogs and toads a chance to escape.
  • Remove clippings: Always remove the cut material to prevent soil fertility from increasing, which would favor grasses over wildflowers. 

How to convert an existing lawn

If you are transforming an existing lawn, the key is to gradually reduce the soil fertility. 

  1. Stop feeding: Halt the use of all fertilisers and weedkillers.
  2. Mow and remove: In the first year, mow regularly and remove the clippings to weaken the grass.
  3. Introduce plants: Grow perennial wildflowers in pots and introduce them into the meadow in subsequent years. You can also sow Yellow Rattle to suppress grass growth. 

AI responses may include mistakes. Learn more

undefined
undefined
undefined

13 sites

  • Wildflower meadow maintenance / RHS GardeningThey may look natural and untamed, but both new and established perennial meadows need specifically timed maintenance to create a balanced mix of grasses and wi…faviconRHS
  • Creating wildflower meadows / RHS GardeningThe main choice is between an annual or perennial mix: * Annual meadows are usually a mix of colourful cornfield annuals such as cornflowers, field poppies, cor…faviconRHS
  • How to Lay Wildflower Turf | BBC Gardeners World MagazineApr 20, 2022 — How to maintain a wildflower meadow * Choose your location – most wildflowers thrive on poor soils, whereas grasses take over on rich soils. Lay your turf on po…faviconBBC Gardeners World Magazine

Show all

Strim hard once in September and ensure removal of strimmings. Rake and compost. Strim again hard in March.

Site Admin

Emoji set & templates
Template – 2025 Weekly
Week Commencing
6-Jan-25
13-Jan-25
20-Jan-25
27-Jan-25
3-Feb-25
10-Feb-25
17-Feb-25
24-Feb-25
3-Mar-25
10-Mar-25
17-Mar-25
24-Mar-25
31-Mar-25
7-Apr-25
14-Apr-25
21-Apr-25
28-Apr-25
5-May-25
12-May-25
19-May-25
26-May-25
2-Jun-25
9-Jun-25
16-Jun-25
23-Jun-25
30-Jun-25
7-Jul-25
14-Jul-25
21-Jul-25
28-Jul-25
4-Aug-25
11-Aug-25
18-Aug-25
25-Aug-25
1-Sep-25
8-Sep-25
15-Sep-25
22-Sep-25
29-Sep-25
6-Oct-25
13-Oct-25
20-Oct-25
27-Oct-25
3-Nov-25
10-Nov-25
17-Nov-25
24-Nov-25
1-Dec-25
8-Dec-25
15-Dec-25
22-Dec-25
29-Dec-25
Template 2025 Monthly
Month
Jan-25
Feb-25
Mar-25
Apr-25
May-25
Jun-25
Jul-25
Aug-25
Sep-25
Oct-25
Nov-25
Dec-25
Template 2025 Quarterly
Quarter
Q1-25
Q2-25
Q3-25
Q4-25
  • 🟢🟡🔴
  • 🚥 🚧
IT Solutions

QR Code generator (free)

XERO

Google Workspace for Non-Profits – Get started

Monday.com

Siteground – website and mail hositing

https://login.siteground.com/?lang=en

WhatsApp Groups

Gasworks – Woodlands & Outdoor areas

Gasworks – Windows

Gasworks / Border Patrol

Gasworks – Ops chat

Gasworks – Sam (fencing)

Gasworks – Wellies

SG GPaM Building Committee – no admin rights to get link

Websites and social media

SudburyGasworks.com

Friends of Sudbury Gasworks Facebook

The Gasworks on Facebook

Instagram.com/sudburygasworks

View Maintenance Pages

Website Admin

Lemontree calendar

WordPress Website Admin